Five-year plan from July 2011 to July 2012
1.Local installation 2. CC pipe installation (Ward-01) 1. Repair of road road And CC Pipe Installation (Ward-02) 1. Locking Installation 2. CC Pipe Installation (Ward-03) 1. Locking Installation 2. CC Installing Pipe (Ward-04) 1. RCC and Pipe Installation Building 3.Markhammadi memorial building (ward-05) 1.R and install cc pipe 2. Bad weather bands (ward-06) 1. Building of verandah in the school (ward-07) 1. Building of verandah in the college (ward-08) 1. Road repair of the road (Ward-09)
July 2012 to July 2013
1. Furniture at the ward (ward-1) 1. Installing the bed 2. Providing benches in the school 3. Construction of house of madrasa (ward-2) 1. RCC and pipe establishment (ward-03) 1. Installation of water 2. Construction, empowerment of the dam Training (Ward-04) 1. Mid-field Gate Construction (Ward-05) 1. Locking (Ward-06) 1. Road repair (Ward-07) 1. Furniture on Furniture (Ward-8) 2. CC Pipe Establishment (ward-09)
From July 2013 to 014 in the year of June
Construction of irrigation project drain 2. Repair of soil roads 3. HB construction (Ward-01) 1. Installation of cc pipe 2. H B Birata Construction 3. Development of Shishma Organization 4. Beauty enhancement 4. Nirir Harmatan (Ward-02) 1 Repair of soil roads Construction of Shaheed Minar 4. Sunder Growth 5 Tree Planting Campaign (Ward-03) 1.College Development2. Development of e-services 4. Wonder growth (ward-04) 1.Local setting 2.HB-Birata Construction (Ward-05) 1.R and CC pipes installed Fill the soil in Peritola Bazar (Ward-06) 1. Locking of furniture 2. Furniture for Furniture (Ward-07) 1. RCC and Piping 2. Tree Planting Expedition 3 Electric fan supply (ward-08) at school. Powdering ripe street badges 3. Construction of polycyclic and vendor (ward-09)
From July 2014 to 2015 in the year of june
And install cc pipes 2. Fill the pavement of pucca road side 3. Locking the place (ward-01) 2. Soccer Field Filling and Tree Planting 2. HBB Road Construction 3. Development of Shishma Institution (Ward-02) 1. HB Construction and Soil Filling 2. Plumbing and Sanitation 3. Construction of Home Building and Furniture in Shishma Organization (Ward-03 ) 1. Construction of toilet in the Golagram market 2. Fill the soil in the EU's courtyard 3. Sorrow enhancement (ward-04) 1. Ring slip supply 2. Boundary wall in the school 3. Empowering Empowerment (Ward-05) 1. Filling soil in school 2.Ring slap (ward-06) 1. HB, BO Bads 2. Tree Planting Campaign (Ward-07) 1. Repair of Mouth Road 2. Construction of Plastics and U.Drying 3. Construction Project Drain (Ward-08) 1. HB Bastera Construction 2.Ring Slope Supply 3. Construction of Shaheed Minar 4 E-service development (ward-09)
From July 2015 - 2016 Eg
1. Ring slot supply 2. Tree plantation operation 3. HB, B, Road construction (Ward-01) 1. Locking plant 2. Tree plantation operation 3. Ring slope supply 4. Construction project drain (Ward-02) 1 Road repair of roads 2. Boundary wall and development in the university 3. Mercury growth (ward-03) 1. Development of the university 2. Installation of CC pipes 3. Improvement of the services (ward-04) 1. Development of landslide 2. Repair of roads (W Road-repairing of road 1.Local establishment 3. Tree Planting Campaign (Ward-06) 1.HB, B, Construction of Road 2.Survival Rise 3.Career Empowerment (Ward-07) 1.Ring Slope Supply 2.Local placement 3. Skill based training for women men (ward-08) 1. School furniture supply 2. Tree plantation operation 3. Installation of cc pipe 4 Electric fan supply in school (ward-09)
Planning and Implementation: Cabinet Division, A2I, BCC, DoICT and BASIS